CHQ-DZM-IS-DIN Instructions

Hochiki Europe (UK) Limited 2-3-0-1366/ISS3/DEC11 Installation – "Smart-Fix" Version Set analogue address before installation (see previous page). The fixing surface should be dry and stable.  Hold the back plate up against the fixing surface and mark the position of the four corner fixing holes.  Determine which cut-out sections along the top and bottom edges of the module require removing to accommodate the cables being used.  Remove cut-outs by scoring with a sharp knife before breaking off with pliers or snips.  Mount the back plate using appropriate fixings (not supplied) for the fixing surface.  Terminate and connect field wiring as per the wiring diagram on pages 2 (and the terminal block indications on the product label). The transparent lid (CHQ-LID) is supplied with four screws and eight retaining washers.  Push the screws through one of the retaining washers and then through the holes in the lid from front to back, pushing another retaining washer onto the end inside the lid.  Screw the lid onto the back plate; do not over tighten the screws as this could damage the unit. Note, a white plastic version of the lid is available (sold separately – CHQ-LID(WHT)). Fig 5 Installation with Back Box For installations requiring glanded cables, a module back box (CHQ-BACKBOX) is available (sold separately). This is mounted on the fixing surface; the CHQ Module is then fitted to the top of the back box and the CHQ-LID is added creating a sealed enclosure. For further details refer to the CHQ-BACKBOX Instructions (2-3-0-800). For installations utilising heavy-duty cabling (for example, 1.5mm 2 solid conductor) the use of the SMB-1 Box with the SMB-ADAPTOR plate and CHQ-ADAPTOR is recommended. For further details refer to the SMB-ADAPTOR Instructions (2-3-0-1502). Ensure any glands used (not supplied) conform to IP67, if such ingress protection is required. Installation – DIN Version Set loop address before installation (see page 2) and write loop address in space provided on door label.  DIN modules should be mounted in a suitable enclosure in conjunction with an NS 35 mounting rail with the loop connections at the bottom of the unit. Hochiki recommends the SMB-2 and SMB-3 Boxes designed specifically for this purpose.  Terminate and connect field wiring as per the wiring diagram on page 2 (and the terminal block indications on the product label).  Suitable anti-static precautions must be taken when handling these products. Status LEDs CHQ-DZM(IS) (all variants) Intrinsically Safe Dual Zone Monitor Green LED flashes each time the unit is polled by the fire alarm control panel. Amber LED is continually illuminated when unit detects short-circuit fault. Protocol specified in TI/006 CHQ-DZM(SCI)-IS 0832-CPD-1659 11 EN54-17 Short Circuit Isolators EN54-18 Input/Output Modules CHQ-DZM/DIN(SCI)-IS 0832-CPD-1660 11 Hochiki Europe (UK) Ltd Grosvenor Road, Gillingham Business Park, Gillingham, Kent, ME8 0SA, England Telephone: +44(0)1634 260133 Facsimile: +44(0)1634 260132 Email: sales@hochikieurope.com Web: www.hochikieurope.com Hochiki Europe (UK) Ltd. reserves the right to alter the specification of its products from time to time without notice. Although every effort has been made to ensure the accuracy of the information contained within this document it is not warranted or represented by Hochiki Europe (UK) Ltd. to be a complete and up-to-date description. Please check our web site for the latest version of this document.

RkJQdWJsaXNoZXIy OTk5NjE4