CHQ-SZM-DIN Instructions
Hochiki Europe (UK) Ltd Page 4 2-3-0-778/ISS8/DEC11 Installation – "Smart-Fix" Version Set analogue address before installation (see page 1). The fixing surface should be dry and stable. Hold the back plate up against the fixing surface and mark the position of the four corner fixing holes. Determine which cut-out sections along the top and bottom edges of the module require removing to accommodate the cables being used. Remove cut-outs by scoring with a sharp knife before breaking off with pliers or snips. Mount the back plate using appropriate fixings (not supplied) for the fixing surface. Terminate and connect field wiring as per the wiring diagrams on pages 2 & 3 (and the terminal block indications on the product label). The transparent lid (CHQ-LID) is supplied with four screws and eight retaining washers. Push the screws through one of the retaining washers and then through the holes in the lid from front to back, pushing another retaining washer onto the end inside the lid. Screw the lid onto the back plate; do not over tighten the screws as this could damage the unit. Note, a white plastic version of the lid is available (sold separately – CHQ-LID(WHT)). Fig 9 Installation with Back Box For CHQ-DIM or CHQ-SZM installations requiring glanded cables, a module back box (CHQ-BACKBOX) is available (sold separately). This is mounted on the fixing surface; the CHQ Module is then fitted to the top of the back box and the CHQ- LID is added creating a sealed enclosure. For further details refer to the CHQ-BACKBOX Instructions (2-3-0-800). For CHQ-DZM installations utilising heavy-duty cabling (for example, 1.5mm 2 solid conductor) the use of the SMB-1 Box with the SMB-ADAPTOR plate and CHQ-ADAPTOR is recommended. For further details refer to the SMB-ADAPTOR Instructions (2-3-0-1502). Ensure any glands used (not supplied) conform to IP67, if such ingress protection is required. Installation – DIN Version Set analogue address before installation (see page 1) and write loop address in space provided on door label. DIN modules should be mounted in a suitable enclosure in conjunction with an NS 35 mounting rail with the loop connections at the bottom of the unit. Hochiki recommends the SMB-2 and SMB-3 Boxes designed specifically for this purpose. Terminate and connect field wiring as per the wiring diagrams on pages 2 & 3 (and the terminal block indications on the product label). Suitable anti-static precautions must be taken when handling these products. Status LEDs Refer to the table below for Status LED indications: CHQ-DIM (all variants) Dual Input Module Green LED flashes each time the unit is polled by the fire alarm control panel and is continuously illuminated when either input is active (CHQ-DIM only). Amber LED is continually illuminated when unit detects short-circuit fault. CHQ-SZM (all variants) Single Zone Monitor CHQ-DZM (all variants) Dual Zone Monitor Protocol specified in TI/006 CHQ-DIM(SCI) 0832-CPD-1098 09 EN54-17 Short Circuit Isolators EN54-18 Input/Output Modules CHQ-SZM(SCI) 0832-CPD-1094 09 CHQ-DIM/DIN(SCI) 0832-CPD-1099 10 CHQ-SZM/DIN(SCI) 0832-CPD-1095 10 CHQ-DZM(SCI) 0832-CPD-1657 11 CHQ-DZM/DIN(SCI) 0832-CPD-1658 11 Hochiki Europe (UK) Ltd Grosvenor Road, Gillingham Business Park, Gillingham, Kent, ME8 0SA, England Telephone: +44(0)1634 260133 Facsimile: +44(0)1634 260132 Email: sales@hochikieurope.com Web: www.hochikieurope.com Hochiki Europe (UK) Ltd. reserves the right to alter the specification of its products from time to time without notice. Although every effort has been made to ensure the accuracy of the information contained within this document it is not warranted or represented by Hochiki Europe (UK) Ltd. to be a complete and up-to-date description. Please check our web site for the latest version of this document.
RkJQdWJsaXNoZXIy OTk5NjE4